Feds grant $62.6M to two-year replacement project for KCK bridge
The grant through the federal infrastructure bill will replace the much-repaired 18th Street bridge over the Kansas River. The project will take two years.
Landscape Architects Design Group (LADG)
Professional Services with a Personalized Touch